Skip to content

Station E05

  • artist
  • gallery
  • collection
  • featured
  • index

Operations in 1978

source

NOV 1 1972 

THIS SPACE SHUTTLE IS SCHEDULED TO START OPERATIONS IN 1978

Vehicle will make round trips ferrying men into orbit and the returning them to earth.

Image credit: North American Rockwell
Image source: Numbers Station

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Tumblr (Opens in new window) Tumblr
  • Click to share on Pinterest (Opens in new window) Pinterest
  • Click to share on Pocket (Opens in new window) Pocket
  • Click to email a link to a friend (Opens in new window) Email
Like Loading...
Unknown's avatarAuthor GPosted on February 7, 2024March 19, 2025Categories Donald Bester, MSFC Space Tug, Numbers Station, Phase C/DTags artist concept, artist rendering, artist's concept, artist's rendering, Bester, Centaur, Centaur G, concept art, concept artist, Donald Bester, Donald Bester, E-0401, Launch Vehicle, NAR, NASA, North American Rockwell, Orbiter, Pre-Phase-C, reusable spacecraft, Rockwell, Saturn, shuttle, Space Shuttle, Space Shuttle, Spacecraft, Spaceplane, STS

Leave a comment Cancel reply

Post navigation

Previous Previous post: 6:10 INTO SPACE
Next Next post: Phase C Final Proposals
  • artist
  • gallery
  • collection
  • featured
  • index
Station E05 Website Built with WordPress.com.
 

Loading Comments...
 

    %d